DCO Application documents

​To download a copy of the Walney Extension Offshore Wind Farm Development Consent Order (DCO) submission documents please click on the following links below:

 

 

Application Documents:

1.1 Cover Letter to the Planning Inspectorate.pdf
1.2 Application Form.pdf
1.3 Copies of Newspaper Notices.pdf

 

2.0 Plans and Drawings:

2.1 Location Plan.pdf
2.2 Land Plans.pdf
2.3.1 Order Limits Key Plan.pdf
2.3.2 Order Limits and Grid Coordinates Plan - offshore - sheets 1-4.pdf
2.3.3 Order Limits and Grid Coordinates Plan - Onshore sheets 5-7.pdf
2.4.1 Works Plan Key Plan.pdf
2.4.2 Offshore Works Plans.pdf
2.4.3 Onshore Works Plans.pdf
2.5 Crown Land.pdf
2.6A Public Rights of Way Plan.pdf
2.6B Street Works Plan.pdf
2.7 Extinguishment of public rights of navigation.pdf
2.8 Statutory nature conservation sites (onshore) plan.pdf
2.9 Statutory Nature Conservation Site (offshore) Plan.pdf
2.11 Heritage sites plan onshore.pdf
2.12 Heritage sites plan offshore.pdf
2.13 Special Category Land.pdf
2.14 Hedgerows Plan.pdf
2.15 Onshore substation general arrangement plan.pdf
2.16 Indicative onshore substation plan.pdf
2.17 Onshore substation height restriction plan.pdf
2.18 Onshore substation landscaping plan.pdf
2.19 Onshore substation permanent access general arrangement plan.pdf
2.20 Onshore substation access cross section plan.pdf
2.21 Landfall general arrangement plan.pdf
2.22 A683 temporary access - general access arrangement plan.pdf
2.23 Imperial Road temporary access - general arrangement plan.pdf
2.24 Middleton Road temporary access - general arrangement plan.pdf
2.25 Carr Lane North temporary access - general arrangement plan.pdf
2.26 Carr Lane South temporary access - general arrangement plan.pdf
2.27 Beach temporary access - general arrangement plan.pdf
2.28 Indicative turbine diagram.pdf
2.29 Noise monitoring locations.pdf

 

3.0 Development Consent Order and Explanatory Memorandum:

3.1 Draft Development Consent Order.pdf
3.2 Explanatory Memorandum.pdf

 

4.0 Book of Reference:

4.1.1 Book of Reference part 1.pdf
4.1.2 Book of Reference part 2.pdf
4.1.3 Book of Reference part 3.pdf
4.1.4 Book of Reference part 4.pdf
4.1.5 Book of Reference part 5.pdf
4.1.6 Book of Reference Schedule.pdf
4.2 Statement of Reasons.pdf
4.3 Statement of Funding.pdf

 

5.0 Consultation Report:

5.0 Consultation Report.pdf
5.1 Consultation report Appendices 1 - 7.pdf
5.2 Consultation report Appendices 8 - 19.pdf

 

6.0 Statement of consents and licenses

6.0 Statement of consents and licences required under other legislation.pdf


7.0 Habitats Regulations Assessment Report:

7.0 Habitats Regulations Assesment Report.pdf
7.1 Habitat Regulations Assessment Report Charts.pdf
7.2 Habitat Regulations Assessment Report Annexes.pdf

 

8.0 Flood Risk Assessment

8.0 Flood Risk Assessment.pdf

 

9.0 Environmental Protection

9.0 Environmental Protection Act–Statement of Engagement.pdf

Environmental Statement

10.1.1_ES_Ch1_Introduction.pdf
10.1.36_ES_Ch1_Introduction Charts.pdf
10.1.2_ES_Ch2_Policy_Legislative_and_Consenting_Framework.pdf
10.1.3_ES_Ch3_The EIA Process.pdf
10.1.4_ES_Ch4_Project_Description.pdf
10.1.37_ES_Ch4_Project Description Charts.pdf
10.1.5_ES_Ch5_Site_Selection_and_Alternatives.pdf
10.1.38_ES_Ch5_Site Selection and Alternatives Charts.pdf
10.1.6_ES_Ch6_Consultation.pdf
10.1.7_ES_Ch7_Metocean_Coastal_Processes_Geology_and_Geomophology.pdf
10.1.39_ES_Ch7_Metocean, Coastal Procceses Geology and Geomorphology Charts.pdf
10.2.7_ES_Annex B2 Metocean and Coastal Processes.pdf
10.2.5A_ES_Annex B.1.A Offshore Windfarm and Cable route Geophysical Survey 2011 (Part 1 - Report).pdf
10.2.5B_ES_Annex B.1.A Offshore Windfarm and Cable route Geophysical Survey 2011 (Part 2 - Charts).pdf
10.2.5C_ES_Annex B.1.A Offshore Windfarm and Cable route Geophysical Survey 2011 (Part 3 - Charts).pdf
10.2.5D_ES_Annex B.1.A Offshore Windfarm and Cable route Geophysical Survey 2011 (Part 4 - Charts).pdf
10.2.5E_ES_Annex B.1.A Offshore Windfarm and Cable route Geophysical Survey 2011 (Part 5 - Charts).pdf
10.2.5_ES_Annex B.1.A Offshore Windfarm and Cable route Geophysical Survey 2011 (Part 6 - Charts).pdf
10.2.5G_ES_Annex B.1.A Offshore Windfarm and Cable route Geophysical Survey 2011 (Part 7 - Charts).pdf
10.2.5H_ES_Annex B.1.A Offshore Windfarm and Cable route Geophysical Survey 2011 (Part 8 - Charts).pdf
10.2.5I_ES_Annex B.1.A Offshore Windfarm and Cable route Geophysical Survey 2011 (Part 9 - Charts).pdf
10.2.6A_ES_Annex B.1.B Cable Route Geophysical Survey 2013 (Part 1 - Report and Appendices).pdf
10.2.6B_ES_Annex B.1.B Cable Route Geophysical Survey 2013 (Part 2 - Charts).pdf
10.2.6C_ES_Annex B.1.B Cable Route Geophysical Survey 2013 (Part 3 - Charts).pdf
10.2.6D_ES_Annex B.1.B Cable Route Geophysical Survey 2013 (Part 4 - Charts).pdf
10.1.8_ES_Ch8_Sediment_and_Water_Quality.pdf
10.1.40_ES_Ch8_Sediment and Water Quality Charts.pdf
10.1.9_ES_Ch_9_Offshore_Noise_and_Vibration.pdf
10.2.8_ES_Annex B3 Noise and Vibration.pdf
10.1.41_ES_Ch10_Benthic Ecology Charts.pdf
10.2.9_ES_Annex B.4.A Benthic Ecology Technical Report.pdf
10.2.10_ES_Annex B.4.B Raw Particle Size Analysis (PSA) data.pdf
10.2.11_ES_Annex B.4.C Photographs from grab surveys.pdf
10.2.12_ES_Annex B.4.D Raw grab faunal datat.pdf
10.2.13_ES_Annex B.4.E Camera analysis (1).pdf
10.2.15_ES_Annex B.4.G Photographs from trawl survey.pdf
10.2.16_ES_Annex B.4.H Raw trawl data.pdf
10.2.17_ES_Annex B.4.I Intertidal raw data - Sediments and Fauna.pdf
10.2.18A_ES_Annex B.4.J Statistical analysis output.pdf
10.2.18B_ES_Annex B.4.K Annex I Habitat Survey Export Cable.pdf
10.1.11_ES_Ch11_Fish_and_Shellfish_Resource.pdf
10.1.42A_ES_Ch11_Fish and Shellfish Resource Charts Part 1.pdf
10.1.42B_ES_Ch11_Fish and Shellfish Resource Charts Part 2.pdf
10.1.42C_ES_Ch11_Fish and Shellfish Resource Charts Part 3.pdf
10.1.42D_ES_Ch11_Fish and Shellfish Resource Charts Part 4.pdf
10.1.42E_ES_Ch11_Fish and Shellfish Resource Charts Part 5.pdf
10.1.12 ES_Ch12 Marine Mammals.pdf
10.1.43_ES_Ch12_Marine Mammals Charts.pdf
10.2.24_ES_Annex B6 Marine Mammals.pdf
10.1.13_ES_Ch13_Offshore_Ornithology.pdf
10.1.44 _ES_Ch13_Offshore Ornithology Charts.pdf
10.2.25_ES_Annex B.7.A Ornithology Technical Report.pdf
10.2.26_ES_Annex B.7.B DCE aerial survey report.pdf
10.2.27_ES_Annex B.7.C Theoretical collision assessment.pdf
10.2.28_ES_Annex B.7.D CRM and migration assessment.pdf
10.2.29_ES_Annex B.7.E. PBR and SPA Apportioning.pdf
10.1.14_ES_Ch14_Intertidal_Ornithology.pdf
10.1.45_ES_Ch14_Intertidal Ornithology Charts.pdf
10.2.30 Environmental Statement Annex B.7.F Intertidal Ornithology Technical Report.pdf
10.1.15_ES_Ch15_Sites Designated for Nature Conservation.pdf
10.1.46_ES_Ch15_Sites Designated for Nature Conservation Charts.pdf
10.1.16_ES_Ch16_Shipping_and_Navigation.pdf
10.1.47_ES_Ch16_Shipping and Navigation Charts.pdf
10.2.31_ES_Annex B.8.A Shipping and Navigation Technical Report.pdf
10.2.32_ES_Annex B.8.B NRA - Hazard review workshops.pdf
10.2.33_ES_Annex_B.8.C_NRA - DECC ship type checklist.pdf
10.2.34_ES_Annex B.8.D NRA - MGN checklist.pdf
10.2.35_ES_Annex B.8.E NRA - Consequences.pdf
10.2.36_ES_ Annex_B.8.F NRA - Corridor assessment.pdf
10.2.37_ES_Annex B.8.G NRA - Oil and gas issues.pdf
10.1.17_ES_Ch17_Commercial_Fisheries.pdf
10.1.48_ES_Ch17_Commercial Fisheries Charts.pdf
10.2.38_ES_Annex B.9 Commercial Fisheries.pdf
10.1.18_ES_Ch18 Marine Archaeology.pdf
10.1.49_ES_Ch18_Chapter 18 Marine Archaeology Charts.pdf
10.2.39_ES_Annex B10A Offshore Archaeological Impact Assessment.pdf
10.2.40_ES_Annex B10B Offshore Written Scheme of Investigation.pdf
10.1.19_ES_Ch19_Seascape_Landscape_and_Visual_Impact_Assessment.pdf
10.1.50_ES_Ch19_Seascape Landscape and Visual Impacts Charts.pdf
10.2.49_ES_Annex B.13.A SLVIA Technical Report.pdf
10.2.50A_ES_Annex B.13.B SLVIA Technical Report Figures (Part A).pdf
10.2.50B_ES_Annex B.13.B SLVIA Technical Report Figures (Part B).pdf
10.2.50C_ES_Annex B.13.B SLVIA Technical Report Figures (Part C).pdf
10.2.50_ES_B.13.B SLVIA Technical Report Figures (Part_D).pdf
10.2.51A_ES_Annex B.13.C SLVIA Technical Report Wireframes and Existing Views (Part A).pdf
10.2.51B_ES_Annex B.13.C SLVIA Technical Report Wireframes and Existing Views (Part B).pdf
10.2.51C_ES_Annex B.13.C SLVIA Technical Report Wireframes and Existing Views (Part C).pdf
10.2.52A_ES_Annex B.13.D SLVIA Technical Report Photomontages (Part A).pdf
10.2.52B_ES_Annex B.13.D SLVIA Technical Report Photomontages (Part B).pdf
10.2.52C_ES_Annex B.13.D SLVIA Technical Report Photomontages (Part C).pdf
10.2.52D_ES_Annex B.13.D SLVIA Technical Report Photomontages (Part D).pdf
10.2.53_ES_Annex B.13.E SLVIA Technical Report Night-time Photomontages.pdf
10.2.54_ES_Annex B.13.F SLVIA Technical Report Cumulative Wireframes.pdf
10.2.55A_ES_Annex B.13.G SLVIA Technical Report Cumulative Photomontages (Part A).pdf
10.1.20_ES_Ch20_Aviation_Defence_and_Telecommunications.pdf
10.1.51_ES_Ch20_Aviation Defence and Telecommunications Charts.pdf
10.2.59_ES_Annex B16 Radar, Aviation and Telecommunications.pdf
10.1.21_ES_Ch21_Other_Infrastructure_and_Licensed_Activities.pdf
10.1.52_ES_Ch21_Other Infrastructure and Licenced Activities Charts.pdf
10.1.22_ES_Ch22_Geology_Hydrology_and_Ground_Conditions.pdf
10.1.53_ES_Ch22_Geology_Hydrology and Ground Conditions Charts.pdf
10.1.23_ES_Ch23_Hydrology and Flood Risk.pdf
10.1.54_ES_Ch23_Hydrology and Flood Risk Charts.pdf
10.2.56_ES_Annex B14 Flood Risk Assessment.pdf
10.2.61_ES_Annex B18 Water Framework Directive.pdf
10.1.24_ES_Ch24_Terrestrial_Ecology_and_Nature_Conservation.pdf
10.1.55_ES_Ch24_Terrestrial Ecology and Nature Conservation Charts.pdf
10.2.57_ES_Annex B.15.A Botany Technical Report.pdf
10.2.58_ES_Annex B.15.B Protected species Technical Report.pdf
10.1.25_ES_Ch25_Land_Use_and_Agriculture.pdf
10.1.56_ES_Ch25_Land Use and Agriculture Charts.pdf
10.1.26_ES_Ch26 Landscape and Visual Impact Assessment.pdf
10.1.57_ES_Chapter 26 Landscape Visual and Impact Assessment Charts.pdf
10.2.42_ES_Annex B.12.A LVIA Technical Report.pdf
10.2.43_ES_Annex B.12.B LVIA Technical Report Figures.pdf
10.2.44_ES_Annex B.12.C LVIA Technical Report Wireframes and Existing Views.pdf
10.2.45a_ES_Annex B.12.D LVIA Technical Report Photomontages (Part A).pdf
10.2.45b_ES_Annex B.12.D LVIA Technical Report Photomontages (Part B).pdf
10.2.46_ES_Annex B.12.E LVIA Technical Report Night-time Photomontages.pdf
10.2.47_ES_Annex B.12.F LVIA Technical Report Cumulative Wireframes.pdf
10.2.48_ES_ B.12.G LVIA Technical Report Cumulative Photomontages.pdf
10.1.27_ES_Ch27 Archaeology and Cultural Heritage.pdf
10.1.58_ES_Chapter 27 Archaeology and Cultural Heritage Charts.pdf
10.2.41_ES_Annex B11 Archaeology and Cultural Heritage (Onshore).pdf
10.1.28_ES_Ch28 Traffic and Transport.pdf
10.2.62_ES_Annex B19.A Onshore Construction Traffic Management Plan.pdf
10.2.63_ES_Annex B19.B Onshore Construction Travel Plan.pdf
10.2.64_ES_Annex B19.C Abnormal Indivisible Loads Access Study.pdf
10.2.65_ES_Annex B19.D Assumptions made to derive the construction traffic forecasts.pdf
10.1.29_ES_Ch29 Air Quality.pdf
10.1.59 _ES_Ch29_Air Quality Charts.pdf
10.1.30_ES_Ch30 Noise and Vibration.pdf
10.1.60_ES_Ch30_Noise and Vibration Charts.pdf
10.1.31_ES_Ch31 Socio-economics.pdf
10.1.61_ES_Ch31_Socioeconomic Charts.pdf
10.2.60_ES_Annex B17 Socio-economics.pdf
10.1.32_ES_Ch32 Inter-relationships.pdf
10.1.33_ES_Ch33_Cumulative_Effects.pdf
10.1.62_ES_Ch33_Cumulative Effects Charts.pdf
10.2.4_ES_Annex A2 Cumulative Effects Discussion Document.pdf
10.1.34_ES_Ch34 Transboundary Effects.pdf
10.1.63_ES_Ch34_Transboundary Effects Charts.pdf
10.2.2_ES_Annex A1 Transboundary screening report.pdf
10.2.3_ES_Annex A2B Secretary of state response to Matrix and report.pdf
10.1.35_ES_Ch35 Summary Monitoing and Mitigation.pdf

Supporting Documents